Main structure of bridge over Danube near Novi Sad connected
(Photo: Shutterstock/Djordje R)
The bridge will connect Petrovaradin with the E-75 highway on the Backa side of the river and take over part of the transit freight traffic, which will reduce the passage of trucks through Petrovaradin and Novi Sad.
Upon completion of the works, better connections will be established between the routes Subotica - Novi Sad - Belgrade and Novi Sad - Zrenjanin - Belgrade with the Fruska Gora Corridor and Ruma.
Iriski Venac bridge and tunnel to be completed in about a year
Serbian President Aleksandar Vucic said in his address during a tour of the works that the construction site looked like a small architectural and construction miracle to him.
Vucic asked the director of the Corridor of Serbia, Aleksandar Antic, when the bridge and the Iriski Venac tunnel, which were part of the Fruska Gora Corridor, would be finished, and received an answer that they would be opened at about the same time, about a year later.
Vucic stated that it had previously been announced that they would be finished by the end of the year and asked Antic and the contractors why the delay was happening.
– It is not good if we tell the people one thing and then have to extend it – added Vucic and stated, after receiving the answer that they had had to change part of the documentation related to the implementation of the project, that all of that could have been done earlier.
The main contractor of the works is the China Road and Bridge Corporation, while the investor and client of the works is the PE Corridors of Serbia.
At the beginning of the route, the corridor connects to the E-75 Belgrade - Novi Sad - Subotica highway, while at the end it connects to the newly built Ruma - Sabac highway and the Sabac - Loznica expressway, as well as the future Slepcevic - Badovinci expressway.
Opis:
Vidi sve
Companies:
Predsedništvo Republike Srbije
Koridori Srbije d.o.o. Beograd
CRBC SERBIA OGRANAK BEOGRAD
Tags:
Aleksandar Antić
Aleksandar Vučić
fifth Novi Sad bridge
Fruška Gora corridor
bridge on the Danube near Novi Sad
Investicije na lokaciji:
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Pratite na našem portalu vesti, tendere, investicione projekte, grantove i pravnu regulativu.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.

Izdanje Srbija
Serbische Ausgabe
Izdanje BiH
Izdanje Crna Gora