All Conditions Met for Reconstruction and Expansion of Prahovo Port – First Green Terminal in Serbia to Be Operational in 40 Months, Capacity to Rise from 1.4 to 3.2 Million Tons
Source: eKapija
Sunday, 27.07.2025.
10:56
Sunday, 27.07.2025.
10:56
(Photo: Shutterstock/Miljan Zivkovic)
Valued at EUR 45.5 million, the reconstruction and capacity expansion project will be fully financed by the Serbian state budget. The first phase includes the rehabilitation of a long-neglected winter dock, employing cutting-edge sustainable and green technologies. Additionally, Serbia’s first green terminal will be established—designed for the collection of hazardous waste from ships, a service that until now has not existed. This was announced by Minister of Construction, Transport, and Infrastructure, Aleksandra Sofronijevic, during a site visit to the port.
- This is a major investment, but we are investing in the port’s modernization for good reason: we believe the long-term benefits will far outweigh the costs, the Minister emphasized.
(Photo: Shutterstock/Miljan Zivkovic)
The vision is for Prahovo Port to also serve as a multimodal logistics terminal. Discussions are expected to resume with Bulgarian counterparts on constructing a 30-kilometer railway link, including a two-kilometer segment on the Serbian side, near the Mokranje border crossing. This would enable year-round cargo transport—even during periods of low water levels or restricted navigation on the Danube, Sofronijevic added.
It’s worth recalling that a public procurement procedure for selecting the construction contractor was completed last autumn, and the contract was signed in December 2024. The selected consortium includes Aqua Mont Service d.o.o. Belgrade, Mont R d.o.o. Meljak, Axis Gradjevinski Biro d.o.o. Sremska Kamenica, Trioprojekt d.o.o. Belgrade, Elixir Engineering d.o.o. Sabac, Statik d.o.o. Kovin, Geodetski Biro Geogroup Negotin, Elixir Craft d.o.o. Sabac, and CRBC Serbia Belgrade. This spring, the Ministry also conducted a tender for selecting the technical supervision team to oversee the execution of the Prahovo Port expansion project.
D.A.
Companies:
Aqua mont service doo Beograd
Mont-R Meljak
Axis građevinski biro d.o.o. Sremska Kamenica
Trioprojekt doo Beograd
ELIXIR ENGINEERING DOO ŠABAC
Statik d.o.o. Kovin
GEOGROUP NEGOTIN
Elixir craft doo Šabac
CRBC SERBIA OGRANAK BEOGRAD
Ministarstvo građevinarstva, saobraćaja i infrastrukture Republike Srbije
Investicije na lokaciji:
2024 - 2026.
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Pratite na našem portalu vesti, tendere, investicione projekte, grantove i pravnu regulativu.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.

Izdanje Srbija
Serbische Ausgabe
Izdanje BiH
Izdanje Crna Gora