Slovenian Kozmetika Afrodita building final processing and packaging facility in Batajnica
Source: eKapija
Friday, 12.12.2025.
10:30
Friday, 12.12.2025.
10:30
The planned layout of the facility (Photo: Urbanistički projekat)
A free-standing ground-floor facility with a total gross construction area of 1,105 m2 will be built on Batajnicki drum Street.
According to the previously published urban design, the facility is primarily intended for the final processing and packaging of cosmetic products (creams, shampoos, soaps, etc.), as well as preparation for product distribution, while a smaller part of the space is intended for administrative and auxiliary facilities. The ground floor will house storage and exhibition space.
Seventeen parking spaces are also planned.
The location of the facility (Photo: Google maps)
The project is scheduled for completion within approximately six months, with construction scheduled to begin on December 10, 2025, and be completed on June 2, 2026.
The conceptual design was developed by the architectural studio Archybility from Belgrade, and the urban design was developed by the design and engineering company MN Group from Belgrade.
B. P.
Opis:
Vidi sve
Tags:
Kozmetika Afrodita Slovenia
Kozmetika Afrodita doo Beograd
Archybility Beograd
MN group Beograd
production and storage facility
facility
construction
Investicije na lokaciji:
2024 - 2025.
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Pratite na našem portalu vesti, tendere, investicione projekte, grantove i pravnu regulativu.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.

Izdanje Srbija
Serbische Ausgabe
Izdanje BiH
Izdanje Crna Gora