Plan for New Chinese Shopping Center in New Belgrade – 476 Outlets and 430 Parking Spaces on Around 34,000 m2
Source: eKapija
Friday, 26.08.2022.
12:01
Friday, 26.08.2022.
12:01
The preliminary design of the new shopping center (Photo: Screenshot/Grad Beograd/UP/Parallel studio)
The facilities of the commercial complex are designed as modern facilities meant for the sale of consumer goods in the form of a shopping center. The facilities feature a triangular shape that follows the borders of the parcels.
Construction in phases is planned. The first phase entails the construction of facility 1, the traffic route and a part of the parking lot for facility 1.
The gross developed area of facility 1 will be 23,400.26 m2, with the accompanying parking lot with 330 spaces, of which 24 are planned for people with disabilities.
The plan is for facility 1 to have access from Jurija Gagarina Street. The facility will have two floors (including the ground floor), and 185 outlets are located on the ground floor, 88 of which are oriented so that the entrance is directly from the floor, whereas 175 outlets are planned on the upper floor. The vertical communication in the facility will take the form of five perimeter staircases, two of which feature freight elevators, and one central staircase. Also, two escalators are to be located in the central part of the facility. The facility has one sanitary block per floor. The length of facility 1 is 156.7 m.
Phase 2 entails the construction of facility 2, whose gross developed area is 10,949.34 m2, with a parking lot with 100 parking spaces. The facility is to have three floors (including the ground floor). The ground floor features 62 outlets, with 27 featuring access from the floor. The first upper floor is to have 54 outlets. The second upper floor is planned as warehouse space. The planned length of the second facility is 294 m.
A parking space is planned between the facilities, whereas a green belt is secured along the parcel.
– Due to the proximity of the river and the problems with flooding, it is necessary to protect the parcels with embankments – the documentation says.
The facilities are accessed from the parking lots by footpaths. The parking lots and the facilities are divided by green areas. A footpath 1.5 meters wide is planned around the facilities, for the purpose of an easier communication with the outlets.
Let us remind that the land publicly owned by the City of Belgrade in the extension of Jurija Gagarina Street was sold for RSD 821.2 million in May this year. The same month, at the Old Palace, the design of the new Chinese center to be built in New Belgrade was presented.
The carrier of the preparation of the project is Yugo Biro from Belgrade, whereas PR Parallel Studio from Belgrade was in charge of preparing the preliminary design.
S. M.
Tags:
Eurasia Trade Center Belgrade
Yugo biro Belgrade
PR Parallel studio Belgrade
Jurija Gagarina Street
construction of new Chinese shopping center
construction of shopping center
Chinese shopping center
new Chinese shopping center
construction of a parking lot
construction of warehouses
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Pratite na našem portalu vesti, tendere, investicione projekte, grantove i pravnu regulativu.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.

Izdanje Srbija
Serbische Ausgabe
Izdanje BiH
Izdanje Crna Gora