Corridor X stretch from Macedonian border to Levosoj opened to traffic
Sunday, 25.08.2013.
14:03
A Corridor X stretch between the Macedonian border and Levosoj, 21 kilometers long, is open to traffic as of Saturday (24 August 2013).
Koridori Srbije CEO Dmitar Djurovic says all the work on this 21.5-kilometer stretch has been completed.
"Just like we promised to Serbian Parliament Speaker Nebojsa Stefanovic during his recent visit, traffic is running smoothly," says Djurovic.
Djurovic also announces the opening of the Donji Neredovac-Srpska Kuca highway section eight kilometers long to traffic by end-September.
A stretch from Grabovnica to the Macedonian border should be finished by the end of 2015.
Koridori Srbije d.o.o. Beograd

Izdanje Srbija
Serbische Ausgabe
Izdanje BiH
Izdanje Crna Gora