Verona Garden Resort – Hotel, annexes, park, 19 pools and other features planned on 40,000 square meters
Source: eKapija
Wednesday, 23.09.2026.
15:58
Wednesday, 23.09.2026.
15:58
(Photo: Ministarstvo prostornog planiranja, urbanizma i državne imovine/LXXVI/Idejno rješenje/Printscreen)
According to the document prepared by the Podgorica-based studio LXXVI, plans call for the construction of a luxury 5-star hotel complex on an urban site covering approximately 40,000 square meters. The complex will integrate high-end hotel accommodation, extensive amenities, and spacious park grounds, all situated in the immediate vicinity of the sea and the Verona Palace.
The construction site is located in the coastal area of Tivat, right next to the Adriatic Highway and the airport, within the flat terrain of the Zupa neighborhood.
(Photo: Ministarstvo prostornog planiranja, urbanizma i državne imovine/LXXVI/Idejno rješenje/Printscreen)
A total of eight buildings are planned - the main hotel and seven annexes. The main hotel building is situated along the city boulevard and serves as the functional and amenity-rich heart of the complex. Annexes 1 and 3 are connected to the main building via underground levels. Together with the main hotel, they account for approximately 76 percent of the complex’s total capacity.
(Photo: Ministarstvo prostornog planiranja, urbanizma i državne imovine/LXXVI/Idejno rješenje/Printscreen)
The annex buildings are distributed throughout the hotel park and designed as smaller, low-rise structures to ensure greater privacy and harmony with the surroundings. Annex 2 stands out in particular, featuring eight luxury duplex units with private gardens and pools. The other annexes range from one to four stories in height (ground floor plus up to three upper floors), with recessed top levels, while one building is dedicated exclusively to an à la carte restaurant designed as a garden pavilion.
(Photo: Ministarstvo prostornog planiranja, urbanizma i državne imovine/LXXVI/Idejno rješenje/Printscreen)
Two underground levels housing technical and service facilities have been designed beneath the central part of the complex; these include a two-level garage with a total of 350 parking spaces, including designated spots for persons with reduced mobility and parking for electric service vehicles. The garage and underground levels also accommodate all necessary technical systems, a car wash, and reservoirs for collecting rainwater and technical water to be used for irrigating green areas.
(Photo: Ministarstvo prostornog planiranja, urbanizma i državne imovine/LXXVI/Idejno rješenje/Printscreen)
Great emphasis has been placed on exterior design and landscape architecture. More than 60 percent of the complex’s area will be landscaped, featuring a Mediterranean-style park with avenues, walkways, and large olive, cypress, bay laurel, and stone pine trees, as well as green roofs and rooftop gardens. A central park plaza, sports courts, and relaxation zones are situated behind the Verona Palace, within the buffer zone of the cultural heritage site.
(Photo: Ministarstvo prostornog planiranja, urbanizma i državne imovine/LXXVI/Idejno rješenje/Printscreen)
Let us remind that, as previously reported by eKapija, the company Benaba submitted a request to the Environmental Protection Agency last year for a determination on the need for an Environmental Impact Assessment study. In January, the Agency announced that the investor had requested to withdraw from the EIA process for the 5-star Verona Garden Resort complex in Tivat due to irregularities and errors identified in the document itself. According to the Agency’s notice, the investor intends to resubmit the document for further processing once the necessary corrections have been made.
PHOTO GALLERY:

Click here to see the entire Special Edition Newsletter
"Invest in Montenegro – Opportunities, Insights, Growth"
read more
Tags:
Benaba
LXXVI
Environmental Protection Agency
Verona palace
tourist complex Verona Garden Resort
construction of hotel Verona Garden Resort
hotel complex Verona Garden Resort Tivat
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Pratite na našem portalu vesti, tendere, investicione projekte, grantove i pravnu regulativu.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.

Izdanje Srbija
Serbische Ausgabe
Izdanje BiH
Izdanje Crna Gora