Bridge at Ada joined - First vehicles to cross it in mid-December 2011
Source: eKapija
Tuesday, 09.08.2011.
13:06
Tuesday, 09.08.2011.
13:06
(Bridge at Ada)
The bridge at Ada was joined on Monday, August 8th, when the last steel segment of the main span was put in place, thus connecting the banks of the Sava river.
This event took place in the presence of Serbian President Boris Tadic, Belgrade Mayor Dragan Djilas, and Chairman of the Belgrade City Assembly Aleksandar Antic.
The bridge at Ada Ciganlija, as an integral part of the inner ring road, will have six lanes, two light rail lines, and two paths for pedestrians and cyclists.
It will be 969 meters long and 45 meters wide, with the central pylon 200 meters high, and it will cost about EUR 120 million, exclusive of access roads.
The bridge will this weekend be opened to citizens who want to take a walk from the Cukarica side to the New Belgrade side of the Sava river. The first vehicles are expected to cross the bridge on December 15th, until when certain part of access roads will have been completed as well. The whole bridge with all access roads is planned to be finished in 2013.
Companies:
Grad Beograd
Tags:
Bridge at Ada
bridge across Ada
bridge across the Sava
bridge at Ada Ciganlija
Boris Tadic
Dragan Djilas
Aleksandar Antic
Belgrade City Assembly
Belgrade light rail
Belgrade metro
Sava
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Pratite na našem portalu vesti, tendere, investicione projekte, grantove i pravnu regulativu.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.

Izdanje Srbija
Serbische Ausgabe
Izdanje BiH
Izdanje Crna Gora