EPS Preparing for Construction of Solar Power Plants and Wind Farms – Tender for Testing of Potential Published
Source: eKapija
Wednesday, 14.12.2022.
15:23
Wednesday, 14.12.2022.
15:23
(Photo: jaroslava V/shutterstock.com)
According to the technical specification of the job, the planned services pertain to wind farms and solar power plants of great power (10 MW and more) and for solar power plants of small power (less than 10 MW) and other services in the field of RES projects.
Among other things, the job entails the preparation of the terrain map, a preliminary analysis of the climatological parameters of the targeted region, an analysis of the possibility of the construction of roof solar power plants on EPS facilities, as well as those on the ground, owned by EPS, a preliminary selection of the type of wind generators, solar panels, and the choice of locations and the estimate of the gross and net production of the RES power plant.
The tender is open until January 17.
B. P.
Companies:
Elektroprivreda Srbije ad Beograd
Tags:
PE EPS
TE KO Kostolac
renewable energy sources
solar power plant
wind farm
construction of solar power plants
construction of wind farms
testing of the potential for the construction of wind farms and solar power plants
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Pratite na našem portalu vesti, tendere, investicione projekte, grantove i pravnu regulativu.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.

Izdanje Srbija
Serbische Ausgabe
Izdanje BiH
Izdanje Crna Gora