RSD 126.3 Billion Planned for Capital Expenditures for Infrastructure – Ministry to Work on 49 Projects in 2021
Source: Tanjug
Sunday, 22.11.2020.
12:04


Illustration (Photo: Val Thoermer/shutterstock.com)

An amount of RSD 40.5 billion is planned for the project of the Hungarian-Serbian railway in 2021.
For the construction of the Belgrade-Sarajevo highway, RSD 4.5 billion is planned, and a sum of RSD 1.1 billion is planned for the construction of the Nis-Merdare highway, Nis-Plocnik section.
Among the planned projects is the construction of the Preljina-Pozega highway section, for which a total of RSD 10.5 billion is to be set aside next year, whereas RSD 15 billion is to be set aside for the Pojate-Preljina highway section.
A total of RSD 8.5 billion is meant for the construction of the Ruma-Sabac-Loznica route, RSD 2.6 billion is to be put into the Novi Sad-Ruma high-speed route, and RSD 4.72 billion is to be set aside for the construction of the Iverak-Lajkovac high-speed route.
A sum of RSD 6.3 billion is planned for the construction of the bypass route around Belgrade, section from the Sava bridge near Ostruznica to Bubanj Potok, and RSD 1.03 billion is set aside for the construction of a new bridge on the Sava in Belgrade.
RSD 7.87 billion is meant for the construction of rail infrastructure and procurement of diesel train engines, and RSD 3.2 billion is planned for the realization of rail infrastructure projects.
Among the planned projects are the construction of new ports and expansion of existing ones. A total of RSD 4.49 billion is planned for the expansion of the capacities of the Port of Smederevo, whereas RSD 2.15 billion is to be set aside for the expansion of the Port of Sremska Mitrovica. A sum of RSD 108 million is to be put into the construction of a new port in Belgrade.
A million dinars is planned for the project of dredging up the sunk German ships from WW2 in 2021.
The plans of the Water Directorate of the Republic of Serbia feature the construction of an icebreaker, for which RSD 221.2 million is planned in 2021.
Companies:


Tags:
Ministry of Construction
Water Directorate of the Republic of Serbia
capital projects
capital investments
budget for capital investments
Hungarian Serbian railway
Belgrade Sarajevo highway
Niš Merdare highway
Niš Pločnik section
Preljina Požega section
Pojate Preljina section
Ruma Šabac Loznica route
Novi Sad Ruma high speed route
Sava bridge
procurement of diesel train engines
construction of ports
Port of Sremska Mitrovica
port in Belgrade
sunk German fleet
construction of an icebreaker
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.