Cement Stabilization on Bypass Route Around Belgrade
Source: Promo
Friday, 30.10.2020.
08:52


(Photo: Miloš Vujković)

On a part of Section 4 (of a total of 4.6 km), the method of stabilization of the base layer with the HRB adhesive, the so-called “cement stabilization”, was implemented. This method is used in cases when the performances of the road structure, as defined by the project, cannot be realized through the use of natural materials.
The stabilization method on these infrastructure projects has confirmed its advantages compared to the traditional construction method, providing additional support, firmness and durability of the structure.
In executing the stabilization process, the Azerbaijani company Azvirt uses the Lafarge hydraulic adhesive for roads Beosol 22.5, at the recommendation and with the formula of the Institute for Roads. Beosol 22.5 is specially designed to stabilize ground stone aggregates and has been tested in detail, by the Lafarge expert team and relevant accredited labs which specialize in road construction.
The bypass route around Belgrade is predicted to be the busiest part of Corridor X, which is why the use of the best quality materials is a priority, so as to ensure its longevity.
Tags:
stabilization of the base layer with the HRB adhesive
cement stabilization
Beosol 22 5 hydraulic adhesive for roads
bypass route around Belgrade
Corridor X
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.