Right-hand Tube of Cortanovci Tunnel on Future Belgrade-Budapest High-speed Railway Dug Through
Source: Tanjug
Sunday, 05.04.2020.
11:52
Sunday, 05.04.2020.
11:52
Illustration (Photo: Ivana Vuksa)
The director of RZD International in Serbia, Mansurbek Sultanov, who attended the opening of the tunnel tube, around 1.1 kilometers long, announced that the entire section between Stara Pazova and Novi Sad would be completed within the deadline, that is, by November 2021.
Sultanov pointed out that the right-hand tube had been dug through before the deadline, considering that the promise made to the Government of Serbia was for it to be done by mid-April.
The 40-km Stara Pazova-Novi Sad section is being built by the Russian Railways in cooperation with Serbian companies. It is a part of the future Belgrade-Budapest high-speed railway, designed for train speeds of up to 200 kilometers an hour.
Tags:
RŽD International
Mansurbek Sultanov
tunnel
Čortanovci Tunnel
coronavirus
covid 19
tunnel excavation
high speed railway
Stara Pazova Novi Sad high speed railway
Belgrade Budapest high speed railway
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Pratite na našem portalu vesti, tendere, investicione projekte, grantove i pravnu regulativu.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.

Izdanje Srbija
Serbische Ausgabe
Izdanje BiH
Izdanje Crna Gora