New industrial zones from Pojate to Preljina – Logistics centers along Morava Corridor to employ 1,000 people
(Photo: Milos Muller/shutterstock.com)

According to the draft spatial plan, the E-761 area between Pojate and Preljina should feature industrial zones and industrial parks in Kraljevo, Krusevac, Cacak, Trstenik, Varvarin and Cicevac, and in the connected area, in Uzice and Novi Pazar.
Furthermore, logistics centers should be formed in Cacak and Kraljevo (the area within the plan) and Uzice (in the connected area). It has been estimated that these centers could employ 500 to 1,000 workers.
According to the draft spatial plan, the Pojate-Preljina section passes through the West Morava valley and connects all the larger places in the region: Stalac, Krusevac, Trstenik, Vrnjacka Banja, Kraljevo and Cacak. Its position makes it very important, as it connects the E-75 highway between Belgrade and Nis (east Serbia) with the E-763 highway between Belgrade and the South Adriatic and the Ibar Main Road (central Serbia), while crossing the following routes: Gornji Milanovac-Cacak-Uzice, Kragujevac-Kraljevo-Raska and Krusevac-Aleksandrovac.
Tags:
Ministry of Construction
E 761 highway
section from Pojate to Preljina
draft spatial plan of E 761 highway
industrial zones between Pojate and Preljina
logistics centers along Morava Corridor
Morava Corridor
Pojate Preljina traffic route
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.